华丽的建筑在灯光的映衬下更加夺目,晶莹的玻璃幕墙让城市更加流光溢彩,闪烁的城市让新型建筑材料大有市场。当通体透明的建筑拔地而起的时候,当我们陶醉于玻璃幕墙制造的绚丽和妩媚的时候,它的清洁问题也不容忽视。
哈利法大楼幕墙安装是个巨大工程,由350名中国专业技工安装了整整14个月。劳动的高峰期,每天要装好175块面板。每完成一整组的安装,都有检测人员用类似二战战机螺旋桨式的发动机组向玻璃表面喷洒水和沙尘。为了擦玻璃,在大楼40层、73层和109层装有特殊轨道和隐藏在转角的升降机,36名清洁工能够一起工作,可是,在正常气候条件下,擦一遍也需要三四个月,哈利法大楼幕墙部分也堪称世界奇迹。
在清洁高空玻璃幕墙的时候,首先查看作业现场,确定作业方案。重点查看屋顶状况,确定能否安装吊篮、吊板,吊篮、吊板在屋顶移动有无障碍;霓虹灯、字牌有无防碍作业等。然后再安装运载工具,如大厦已安装擦窗机,则按规范做操作前的检测。
作业人员携带工具上吊篮或吊板,有些工具应拴在吊篮或吊板上,以防不小心失手落下,伤了行人。在地面设安全防护拦绳,或置安全警告牌。作业方式从上到下。每擦拭完一行,整理工具、加清洗剂、横向移动吊板或吊篮,再继续下一行作业。
在施工的时检查玻璃上有无粘着物等污迹,如有,先用刮刀等相应辅助工具和溶剂除去。将涂水器浸入桶中,待充分吸入清洁剂后用手轻轻捋一下(以不往下滴水为宜),均匀涂在玻璃上。涂抹时,一般由上往下滚,横向移动,每趟滚迹要交叉相压,以防漏涂。用胶刮将玻璃上的清洁剂刮净,操作时应稍用力,将胶刮均匀按压在玻璃上,由上往下缓缓刮动,每刮完一行,用湿毛巾将胶刮擦拭干净再刮下一行。
施工后期确认一次应作业范围内的墙面已清洗完毕,滑动吊篮或吊板继续往下作业。全部作业完成后,收拾整理设备和工具,撤离地面防护拦绳或警告牌,将地面水迹擦净。
Ornate building more eye-catching in the light against the background, glistening glass walls make the city more bright colors , flashing a great city to allow new building materials market . When the body transparent building going up , and when we revel in the splendor of the glass curtain wall manufacturing and charming when it 's clean can not be ignored .
Khalifa building curtain wall installation is a huge project , the 350 Chinese professional technicians installed a full 14 months. The peak of the labor day to installed 175 panels. Each complete the installation of a whole group of people with a World War II fighter planes have detected similar propeller engine block spray water and dust to the glass surface. To Cabo , the 40-story building , 73 layers and layer 109 is equipped with special tracks and hide in the corner of the elevator , 36 cleaners can work together , but , under normal weather conditions, wipe it needs three or four months , part of the building facade Khalifa also called wonders of the world .
Clean the glass wall at high altitude , the first view the job site , to determine the operating plan. Focus your roof condition , to determine whether the installation of hanging baskets, hanging panels, hanging baskets, hanging panels on the roof to move Accessible ; neon , plates or without hinder job and so on. Then install a vehicle , such as the gondola building has been installed , press the norm to do testing before the operation .
Workers carry the tools hanging basket or plate , some tools should be tied in hanging baskets or board , to prevent accidentally missed fall, hurt pedestrians. Safety bar located on the ground rope, or home safety warning signs . Practices from top to bottom . Each wipe finish line , finishing tools, plus cleaning agents, boatswain's chair or lateral movement of the basket , and then continue to the next line operations.
During the construction of the glass when checking whether the adhesive material , such as stains , if any , is removed with a scraper and other appropriate first aid and solvents. After coated with water immersion bucket , to be fully inhale gently stroked cleaner look ( with no dripping appropriate ) , evenly coated on the glass . When applied , the general roll from top to bottom , lateral movement , every trip to the cross -phase pressure roller tracks to leak painted . With a squeegee to scrape the glass cleaner , the operation should be a little harder , push the squeegee evenly on the glass , from top to bottom slowly scraping every scraped off line with a wet towel to wipe the squeegee again scraped line.
Post- construction should be confirmed once the wall has been cleaned within the operating range of the finished sliding plate hanging basket or continue down the job . After all the job is complete, clean finishing equipment and tools , evacuation floor protective barrier rope or warning signs , wipe the surface water traces .